Goa inks MoU with Starlink to explore satellite internet for smart governance, disaster response
Wife of this billionaire buys MF Hussain's painting for Rs 118 crore, details here
T20I World Cup 2026: BCB makes another request to ICC, asks for more time to talk to Bangladesh govt
Trump calls PM Modi 'fantastic leader,' says will have 'great deal' with India
DNA TV Show: India's hypersonic vision on Republic Day 2026 parade
Deepinder Goyal resigns as Zomato CEO: Know his net worth, Eternal Q3 profit and more
INDIA
In a move to prevent accidents, Railways has given its nod to a Rs 28.61 crore contract for installation of a train protection warning system (TPWS) along the 67-km Basin Bridge-Arrakonam route in south India. Thales India has been awarded the contract, according to a senior Railway Ministry official.
TPWS, which is based on European Train Control System (ETCS) Level-I, is a proven train protection technology meant to prevent accidents due to a driver's failure to observe a signal or speed restriction. The system has been deployed extensively by Western countries. If a locomotive driver fails to observe the signal, the automatic brake will be activated and the train would stop, said the official.
Information regarding signal aspects, maximum permissible speed for a particular section, gradient, inter-signal distance and speed restrictions is taken into account while calculating the target speed and target distance displayed on DMI (driver-machine interface) in TPWS-equipped locomotives.
"A total of 169 signals in the Basin Bridge-Arrakonam section will be protected with the TPWS," said the official, who added that "Thales will deploy its ETCS Level-I solution and will be responsible for the design, supply, installation and commissioning of track-side equipment."
The commissioning of the TPWS is expected to be achieved by 2015. TPWS has been implemented as a pilot project on the 50-km Chennai-Gummidipundi suburban section. The advanced system has also been commissioned on the 25-km Dum Dum-Kavi Subhash section of Kolkata Metro. Also, TPWS trials are in progress with 35 locomotives on selected trains on the 200-km long Nizamuddin-Agra section.