INDIA
Sources in ISRO said that when a leak in the upper stage cryogenic engine was plugged, an overall check of the first stage, too, should have been conducted to ensure a successful launch.
Two days after ISRO’s geosynchronous satellite launch vehicle (GSLV) mission failed, the agency is now trying to figure out what went wrong with the rocket.
The agency, initially, wondered whether it was the failure of an actuator or the snapping of the first stage connectors that led to the second consecutive failure of the (GSLV) on Christmas day; but the scientists are now thinking whether five days was too short to correct the defect that was first noticed on December 20.
The GSLV mission was postponed from December 20 – when a ‘minor’ leak in one of the valves of the Russian cryogenic engine as detected – to December 25, when it failed.
Sources in ISRO told DNA that when a leak in the upper stage cryogenic engine (the last stage engine that takes the capsule carrying the satellite to its predetermined location in space) was plugged, an overall check of the first stage, too, should have been conducted to ensure a successful launch.
“But five days was not enough to do all that; and, obviously, it now appears that we overlooked the problem in the first stage itself,” said a scientist involved with the mission.
The GSLV-F06 rocket, carrying the advanced Rs125 crore GSAT-5P communication satellite lacked thrust and veered off course barely 50 seconds after the 4.04pm lift-off on December 25, forcing the scientists at the Satish Dhawan Space Centre in Sriharikota to press the self-destruct button and explode the satellite. This happened 63 seconds after lift-off.
Interestingly, the very first attempt to launch the GSLV programme on March 28, 2001, was also aborted a second before lift-off due to a snag.
It was rescheduled for April 18, 2001 – 21 days after the original date – when it was successfully launched to mark the beginning of India’s GSLV series of launchers. The problem then was the lack of thrust due to defective plumbing in one of the four first stage strap-on engines.
However, former ISRO chairman and current chairman of governing council of Physical Research Laboratory (PRL), Ahmedabad, Prof UR Rao told DNA that everything had been monitored and that the problem arose seconds after the launch, catching the scientists unawares.
“The actuator seems to have failed to receive commands from the onboard computer of the rocket,” he said. The actuators are linked with the rocket motor, the failure of which may have caused GSLV-F06 to veer off course and break up.
ISRO chairman K Radhakrishnan said the scientists were also verifying whether it was the snapping of first stage connectors of the GSLV-F06 that led to the failure of the mission.
“There are hundreds of pages of data pertaining to a few seconds after the lift-off that the scientists have to study. Only then can we arrive at the precise problem that led to aborting the mission,” said Prof Rao.
Delhi- NCR news: GRAP stage I curbs revoked after decrease in air pollution
These e-commerce sites stop selling Turkish clothes in wake of boycott call
Meet the ‘Gold Man' of Indore, who redefines street food in style, serves 24-carat gold kulfi
'I will make it one day': Karan Johar drops big update on Takht, confirms it's NOT shelved, but...
PBKS vs RR: Punjab Kings captain Shreyas Iyer joins new list in IPL 2025 after scoring...
Gautam Adani's company teams up with US firm to build India's first...
Who is Hrishikesh Hemant Kanitkar? India A head coach for upcoming England tour
CJI BR Gavai issues BIG statement days after taking oath, says 'Constitution of India...'
Teen stabbed to death after dispute over playing music at event in Delhi, probe underway
Desi eggs vs regular eggs: Which one is a healthier option?
'Virat Kohli counted money, ate food...': Ex-teammate recalls star batter’s early struggles
Mukesh Ambani's BIG win as Reliance earns Rs 106703 crore in just 5 days, emerges as biggest...
Ghaziabad: Cop jumps into canal to stop woman from attempting suicide, then THIS happened
Who is Johannes Pietsch aka JJ? Austrian singer crowned winner of Eurovision 2025 contest
Meet NEET Topper, who scored 715 out of 720 marks and 99.9 percentile, she is..., her AIR was..,
Paresh Rawal breaks silence on quitting Hera Pheri 3: 'My decision to step away was...'
Kerala Plus 2 Result 2025 expected on THIS date, know how to download Kerala DHSE class 12 marksheet
Amid boycott calls for Sitaare Zameen Par, Aamir Khan Productions takes this big step, changes...
Big tension for cash-strapped Pakistan, 11 million people projected to face..., reason is...
Bad news for Pakistan! IMF imposes 11 new conditions on bailout package; What are they?
Operation Sindoor: Here's a full list of 51 politicians, 8 ambassadors who will brief world capitals
SHOCKING! Just week after wedding, man in UP's Varanasi thrashes third wife to death
Can RCB still be knocked out of Playoffs race in IPL 2025? Find it out here
Hyderabad: At least 17 killed in major fire at building near iconic Charminar
KL Rahul set to break Virat Kohli's massive T20 record, to become fastest Indian to reach...
Pakistan high commissioner trapped in honeytrap with…, here's what Pakistan is saying
VIDEO: Mexican navy ship strikes New York's Brooklyn Bridge, people seen hanging on to masts
JAC Jharkhand Class 10, 12 results 2025 to be declared soon at jac.jharkhand.gov.in, check details
US: 27 dead, many injured as severe storms rip through Kentucky, Missouri, other states
'Mission could not be...': ISRO chief Narayanan on EOS-09 satellite launch
Meet man, son of shepherd, left job and cleared UPSC exam in third attempt, his AIR is...
ISRO crosses hundred mark: Launches its 101st satelite EOS-09 aboard PSLV-C61
Col Sofia Quraishi's twin sister takes part in Tiranga Yatra, hails Op Sindoor
Three killed, one injured as under-construction building collapses in Delhi's Paharganj
'How is he alive?': Spine-chilling video of man casually petting 'King Cobra' goes viral